CES Energy AIB Tri-generation Solution

AIBClient

  • AIB contact centre, Swords Dublin
  • 5,500sqm 3 story building
  • 280kw Tri-generation solution
  • Pre packaged plant room delivered to site
  • LV supply
  • Commencement 2007

Equipment overview

  • 280 kW CHP unit
  • 395 kW Heat Exchanger
  • 266 kW Absorption chiller
  • 395 kW Blast Cooler

CES Energy

Design – CES Energy responsible for the design and delivery of the turnkey Tri-generation solution and energy centre

Finance model – CES Energy was contacted as a design and build energy contractor to provide the entire energy plant – CHP, Absorption chiller, electric chiller, boilers, etc.

Operation and maintenance – CES Energy is responsible for all maintenance and operation of the building.